Patriots Day Storm Slope Repair Project Challenges Saving the owners driveway which was within 3’ to the top of the bank. Working with the tides. The access road to the bottom of the washout was only usable during low tide. CompletedCompletedTide coming inTide coming...
Blackrock Farm Irrigation Pond In 2009, we dug an irrigation pond for a local Landscape and Nursery Farm. They were in need of a way to water their nursery while still preserving the beauty of the natural farm setting. We worked with Helane Lewand who is the owner to...
Shoreline Restoration In 2013, we worked with Wetlands & Wildlife Biologist to help restore storm and wave erosion to the frontal dunes. We used our bull dozers, loader and excavators to reshape and grade the eroding...